Contractor – STRABAG
The new bridge is being constructed using a hashtag#SpanBySpan method with an Overhead Movable Scaffolding System (OHMSS).
OHMSS Technical Specifications
– Max. Span 42.8 m
– Max. MSS Span 36.3 m
– Superstructure Weight~25.4 t/m
– Bridge Slab Width 12.375 m
– Max. Transversal Slope 2.5%
– Max. Longitudinal Slope 0.5%
Construction Sequence:
Southern Extension: A new two-lane highway bridge will be built south of the existing structures. The new Leineflut bridge will span 240 meters—50 meters longer than the original.
Traffic Diversion: Traffic will be rerouted onto the newly completed southern section.
Demolition: The existing bridge will be dismantled.
Northern Construction: The northern part of the new bridge will be built in its place.
The new bridge is being constructed using a hashtag#SpanBySpan method with an Overhead Movable Scaffolding System (OHMSS).
OHMSS Technical Specifications
– Max. Span 42.8 m
– Max. MSS Span 36.3 m
– Superstructure Weight~25.4 t/m
– Bridge Slab Width 12.375 m
– Max. Transversal Slope 2.5%
– Max. Longitudinal Slope 0.5%
Construction Sequence:
Southern Extension: A new two-lane highway bridge will be built south of the existing structures. The new Leineflut bridge will span 240 meters—50 meters longer than the original.
Traffic Diversion: Traffic will be rerouted onto the newly completed southern section.
Demolition: The existing bridge will be dismantled.
Northern Construction: The northern part of the new bridge will be built in its place.