At Raunheim, Mönchhof-Dreieck, 3 level crossing the old viaduct over the A3 and A67 was demolished by Max Wild GmbH.
Strukturas Underslung MSS was assembled behind the abutment and launched forward below the lifted bridge deck.
It was minimal intervention to the traffic on the highway below the deck.
The challenging MSS installation conditions were carried out by a professional site crew from Strukturas.
In order to carry out the demolition work efficiently and safely while the motorways were in use, the 3,200-tonne bridge superstructure was first raised by 5.20 metres and then a 130-metre-long supporting Underslung Movable Scaffolding System was inserted below. As general contractor, Max Wild GmbH took over the complete service for the demolition work at the Mönchhof Triangle and spent six months preparing and planning the actual demolition.
Thanks for good cooperation to our professional client Max Wild GmbH
The demolition of the old bridge with MSS is an effective and safe solution.
Stay tuned for more information about this exciting project!